Engineering Projects
Jordan Valley Water has a variety of project opportunities for consultants and contractors. Click the current or future project you are interested in for details and the status.
= The project will request consultant proposals
= The project will request contractor/supplier bids/proposals
Corrosion Prevention
-
JA-4 Cathodic Protection System Design
-
Reservoir Painting
Electrical
-
Electrical Generation Improvements-Purchase Generation Equipment
Engineering Studies
-
Wasatch Front Regional Pipeline Alignment Study
Landscaping
-
Landscaping Improvements at Existing Sites
Maintenance
-
JA-4 & JA-1 Pigging
Pipeline
-
3200 West Pipeline
-
6400 West Pipeline
-
Distribution Pipeline Replacement
-
SWGWTP By-product Pipeline
-
SWGWTP Feed Water Pipelines
-
Southeast Raw Water Collection Pipeline Middle Fork Diversion Structure
-
Southwest Aqueduct Reach Two
Pump Station
-
3200 West 11800 South Zone C Pump Station Construction
-
7000 West 10200 South Zone D Pump Station
Reservoir
-
Reservoir Drain Improvements
-
Zone D Reservoir
Security
-
Fencing Security Improvements
-
Security Improvements - Reservoir Sites
Structural
-
JVWTP Filter Building Seismic Rehabilitation
Treatment
-
JVWTP PEA & PAC Chemical Feed Improvements
-
JVWTP – Chlorine Dioxide Pre-design
-
SWGWTP Southwest Groundwater Treatment Plant
Valve & Meter Vaults
-
Wholesale Meter Station Upgrades II
Well Drilling
-
Drill Production Wells at Forbush, Mt Jordan
-
Drill Production Wells at Murray-Holladay Rd and Cottonwood St
-
SWGWTP Deep Well Drilling (2700 West)
Well House Construction
-
SWGWTP 1300 West Well Site Construction
-
Well House Design and Construction (6400 South, Moniter Drive, 1330 East)
-
Well House Design and Construction (Etienne Way, Murray-Holladay Rd and Cottonwood Str)
Well Rehabilitation
-
Well Rehabilitation (2007)
-
Well Rehabilitation (2008)
Current Notices:
JA-4 & JA-1 Pigging
-
Request for Proposal Issued
General Documents
Invitation for Statements of Qualifications (Adobe)
Invitation for Statements of Qualifications (Word)
2008-2009 Completed Project Reports
Distribution Pipeline Replacements
2007-2008 Completed Project Reports
2006 Landscaping Project
30-inch Zone D Pipeline
Flow Control Improvements
Four Well Pump Stations
Jordan Aqueduct Hydraulic Power Units
Jordan Narrows Pump Station Ventilation Replacement
Laboratory Information Management System
Maintenance Management System
Meter Station Upgrades
Well Drilling