Project Details

Engineering project details, documents, and contact information can be found below.

2022 Vault Improvement Project

Project Information

Project Name
2022 Vault Improvement Project
Project Type
Valve & Meter Vaults
Project Manager
Kevin Rubow
Project Description
Improvements to existing valve vaults for transmission waterlines ranging from 16-inch to 33-inch. The project will include vault modifications at seven separate locations.
Consultant
Hansen, Allen & Luce
Estimated Bid Documents Available
September 2021

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

9/23/2021 - Bid Documents Addendum

Addendum No. 1 is now available for the 2022 Vault Improvement Project on the District's website.

9/20/2021 - Announcement

An attachment has been provided to reference the locations of the existing vaults and piping. The attachment can be downloaded from www.jvwcd.org under the Engineering Projects link.

9/8/2021 - Bid Documents Available

Bid Documents for the 2022 Vault Improvement Project are now available. It includes the replacement or abandonment of vault piping and valves at seven locations and construction of a new valve vault. Bid documents are available online through www.jvwcd.org under the Engineering Projects link.

Contract Documents and Project Information

Date Type Description Download
9/23/2021 Bid Documents Addendum Addendum #1 Download
9/20/2021 Attachment Vault locations - GIS images Download
9/14/2021 Attachment Pre-bid sign-in sheet Download
9/8/2021 Bid Documents Volume 1 - Bid Documents Download
9/8/2021 Bid Documents Volume 2 - Bid Drawings Download