JA-3 Cathodic Protection System

Project Information

Project Name
JA-3 Cathodic Protection System
Project Type
Corrosion Protection
Project Manager
Conor Tyson
Engineering Contract Date
5/24/2021
Consultant
Infinity Corrosion Group, Inc
Estimated Bid Documents Available
November 2021
Bids Due
12/15/2021 2:30 PM
Estimated Construction Cost
$170,000 - $280,000

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

12/3/2021 - Bid Documents Addendum

Addendum #1, specifying rectifier outputs, is now available. The bid date and time remain December 15th at 2:30.

11/18/2021 - Bid Documents Available

Bid documents for the JA-3 Cathodic Protection System are now available on the Jordan Valley Water Conservancy District Webpage. Bids are due by December 15th, at 2:30 pm.

Contract Documents and Project Information

Date Type Description Download
12/3/2021 Addendum Addendum #1 Download
11/18/2021 Bid Documents Bid Documents Download
11/18/2021 Drawings Bid Drawings Download
11/18/2021 Bid Documents Specifications Download