2016 West Temple and Main Street Distribution Pipeline Replacements

Project Information

Project Name
2016 West Temple and Main Street Distribution Pipeline Replacements
Project Type
Pipeline
Project Manager
Kevin Rubow
Project Description
The “2016 West Temple and Main Street Distribution Pipeline Replacements” Project consists of abandoning approximately 20,000 feet of 8”, 6”, and 4” cast iron pipe between 3300 South and 4200 South and between Finlay Drive and State Street which were installed in the 1960s. New 12” and 8” C-900 PVC will be installed in the area, along with new fire hydrants and valves. Existing services that are galvanized steel or black poly will be replaced with copper pipe of the same diameter and all services will be connected into the new PVC pipe. This work will also entail water main hot-tapping, excavation, and asphalt pavement and concrete replacement.
Consultant
Staff
Construction Contract Date
7/11/2016
Bids Due
5/25/2016 2:00 PM
General Contractor
Noland and Son Construction Co., Inc.
Estimated Construction Cost
2.5 Million

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

There are no public notices at this time.

Contract Documents and Project Information

There are no documents attached to this project.