Southwest Aqueduct Reach 1

Project Information

Project Name
Southwest Aqueduct Reach 1
Project Type
Pipeline
Project Manager
Travis Christensen
Project Description
Design and construct the Southwest Aqueduct Reach 1 from the Jordan Narrows Pipeline/Jordan Aqueduct Reach 1 Interconnect Vault (16535 South 1300 West) to the Jordan Valley Water Treatment Plant (15305 South 3200 West). Approximately 12,000 feet of 66-inch diameter welded steel pipe will be installed. The project design engineer and construction inspector is Bowen, Collins & Associates.
Prequalification Submittals Due
12/6/2017 2:00 PM
Estimated RFP Release Date
November 23, 2016
Engineering Contract Date
1/11/2017
Proposals Due
12/12/2016 3:00 PM
Consultant
Bowen Collins & Associates
Estimated Bid Documents Available
December 13, 2017
Estimated Construction Cost
20 Million

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

11/14/2017 - Invitation for Contractor Prequalfication

Invitation for Contractors Prequalifications Submittals for the Southwest Aqueduct Reach 1, a 66-inch, 12,000 foot, welded steel raw water pipeline . Obtain prequalification submittal documents through www.jvwcd.org under the Engineering Projects link. Contractor prequalification submittals are due by 2:00 pm, December 6, 2017. Any questions should be directed to the project manager, Travis Christensen. Thank you for your interest.

Contract Documents and Project Information

Date Type Description Download
11/14/2017 Invitation for Contractor PreQualification Southwest Aqueduct Request for Contractor Prequalification Submittal Download