Southwest Aqueduct Reach 1

Project Information

Project Name
Southwest Aqueduct Reach 1
Project Type
Pipeline
Project Manager
Travis Christensen
Project Description
Design and construct the Southwest Aqueduct Reach 1 from the Jordan Narrows Pipeline/Jordan Aqueduct Reach 1 Interconnect Vault (16535 South 1300 West) to the Jordan Valley Water Treatment Plant (15305 South 3200 West). Approximately 12,000 feet of 66-inch diameter welded steel pipe will be installed. The project design engineer and construction inspector is Bowen, Collins & Associates.
Prequalification Submittals Due
12/6/2017 2:00 PM
Estimated RFP Release Date
November 23, 2016
Engineering Contract Date
1/11/2017
Proposals Due
12/12/2016 3:00 PM
Consultant
Bowen Collins & Associates
Estimated Bid Documents Available
December 15, 2017
Construction Contract Date
2/14/2018
Bids Due
1/30/2018 3:30 PM
General Contractor
COP Construction
Estimated Construction Cost
20 Million

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

4/5/2018 - Request for Proposal Issued

The SWA-1 Materials Testing RFP is now available on the District's website. Proposals are due on April 20, 2018 at 3:00 PM.

Contract Documents and Project Information

Date Type Description Download
4/5/2018 Materials Testing Bid Documents SWA-1 Materials Testing RFP Download