Project Details

Engineering project details, documents, and contact information can be found below.

Three Vault Modification Project

Project Information

Project Name
Three Vault Modification Project
Project Type
Valve & Meter Vaults
Project Manager
Kevin Rubow
Project Description
Modifications to existing valve vaults at three separate locations. Modifications include removal of existing 30" gate valves and piping, installation of new 30" butterfly valves and piping, and additional improvements.
Estimated Bid Documents Available
January 2020

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

1/17/2020 - Bid Documents Addendum

Addendum No. 1 is now available for the Three Vault Modification Project on the District's website.

1/3/2020 - Bid Documents Available

Bid Documents for the Three Vault Modification Project are now available. It includes the replacement of piping and valves at three separate locations. Bid documents are available online through www.jvwcd.org under the Engineering Projects link.

Contract Documents and Project Information

Date Type Description Download
1/17/2020 Bid Documents Addendum Addendum #1 Download
1/3/2020 Bid Documents Three Vault Project - Bid Documents Download
1/3/2020 Bid Documents Three Vault Project - Drawings Download