Project Details

Engineering project details, documents, and contact information can be found below.

Terminal Reservoir Basin 2 Outlet Valve Replacement

Project Information

Project Name
Terminal Reservoir Basin 2 Outlet Valve Replacement
Project Type
Reservoir
Project Manager
Travis Christensen
Project Description
This project consists of replacement of a submerged 48” AWWA butterfly outlet valve in Basin 2 of the Terminal Reservoir. The work will include removal and disposal of the existing 48” butterfly valve and gear box. Installation of one (1) new 48” AWWA butterfly valve and gearbox with connection to the existing gearbox shaft. The work shall occur within a 7-day shutdown period between January 3, 2021 and February 28, 2021. Two (2) Owner supplied 18" gate valves will be installed to replace drain valves in Basin 1 & 2.
Estimated Bid Documents Available
July 14, 2020
Bids Due
7/28/2020 3:00 PM
General Contractor
Ellsworth Paulsen Construction
Estimated Construction Cost
50-100k

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

There are no public notices at this time.

Contract Documents and Project Information

There are no documents attached to this project.