Terminal Reservoir Basin 2 Outlet Valve Replacement
Project Information
Project Name
Terminal Reservoir Basin 2 Outlet Valve Replacement
Project Type
Reservoir
Project Manager
Travis Christensen
Project Description
This project consists of replacement of a submerged 48” AWWA butterfly outlet valve in Basin 2 of the Terminal Reservoir. The work will include removal and disposal of the existing 48” butterfly valve and gear box. Installation of one (1) new 48” AWWA butterfly valve and gearbox with connection to the existing gearbox shaft. The work shall occur within a 7-day shutdown period between January 3, 2021 and February 28, 2021. Two (2) Owner supplied 18" gate valves will be installed to replace drain valves in Basin 1 & 2.
Estimated Bid Documents Available
July 14, 2020
Bids Due
7/28/2020 3:00 PM
General Contractor
Ellsworth Paulsen Construction
Estimated Construction Cost
50-100k
Contact/Planholders List
This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.
Public Notices
There are no public notices at this time.
Contract Documents and Project Information
There are no documents attached to this project.