Project Details

Engineering project details, documents, and contact information can be found below.

JVWTP Sedimentation Basin Equipment Replacement

Project Information

Project Name
JVWTP Sedimentation Basin Equipment Replacement
Project Type
Treatment
Project Manager
David McLean
Project Description
The Jordan Valley Water Conservancy District desires engineering assistance to  (1) pre-purchase replacement sludge collection equipment for Jordan Valley Water Treatment Plant (the existing chain and flight equipment has reached the end of its design life); (2) prepare design documents for installation of said equipment; and, design required repairs to the existing circular clarifier equipment to enable use of this aged equipment until a planned plant expansion summer of 2025.
Estimated RFP Release Date
6/10/2021

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

7/29/2021 - Bid Results

The District received bids for the JVWTP Solids Handling Equipment Preselection Package.  Two bids were received.    Bid results have been posted to the District's website.  Additional information is available as allowed by law.

7/22/2021 - Bid Documents Addendum

Receipt of bids has been extended by Addendum # 1 from 1:00 pm, on July 27, 2021 (mountain daylight time) to 4:00 pm, on July 29, 2021 (mountain daylight time).

7/20/2021 - Bid Documents Available

Jordan Valley Water Conservancy District requests bids for the Jordan Valley Water Treatment Plant Solids Handling Equipment Preselection Project”. The request specifies supply and delivery of replacement chain and flight solids collection equipment for basins 3,4,5,6 at the existing Jordan Valley Water Treatment Plant located at 15305 South 3200 West, Herriman, Utah  84065.

7/14/2021 - Announcement

The Jordan Valley Water Conservancy District Board of Trustees on July 14, 2021 approved an award of Engineering Contract in the amount of $267,164 for JVWTP Sedimentation Basins Equipment Replacement to Brown and Caldwell.

Additional information is available as allowed by law.

Contract Documents and Project Information

Date Type Description Download
7/29/2021 Bid Results Bid Results Download
7/22/2021 Addendum Addendum 1 Download
7/20/2021 Bid Documents Solids Handling equipment Preselection Package Download