2025 Pipeline Replacement - Woodstock Area
Project Information
Project Name
2025 Pipeline Replacement - Woodstock Area
Project Type
Pipeline
Project Manager
John Kahle
Project Description
The “2025 Distribution Pipeline Replacements – Woodstock Area” project consists of abandoning approximately 6,350 feet of 6” cast iron pipe installed between the 1950s and 1960s and replacing it with new 8” C-900 PVC and new fire hydrants and valves. Existing services that are galvanized steel or black poly will be replaced with copper pipe of the same diameter and all existing services will be connected to the new water main. This work will also entail water main hot-tapping, excavation, asphalt pavement, and concrete replacement.
Consultant
JVWCD
Estimated Bid Documents Available
January 2025
Estimated Construction Cost
1,800,000 to 2,400,000
Contact/Planholders List
This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.
Public Notices
1/27/2025 - Bid Results
Bid results for the 2025 Distribution Pipeline Replacement - Woodstock Area Project were received on January 27, 2025, at 3:00 pm. The results of the bids are posted on the district website. The district expresses its appreciation for the time and effort it takes to provide a bid for a project. Additional information is available as allowed by law.
Contract Documents and Project Information
Date | Type | Description | Download |
---|---|---|---|
1/27/2025 | Bid Results | Bid Results | Download |
1/22/2025 | Addendum | Addendum #1 | Download |
1/13/2025 | Planholders List | Pre-Bid Meeting Sign In Sheet | Download |
1/6/2025 | Bid Documents | Bid Documents | Download |
1/6/2025 | Drawings | Drawings | Download |
1/6/2025 | Bid Documents | Technical Specifications | Download |