2025 Pipeline Replacement - Woodstock Area

Engineering project details, documents, and contact information can be found below.

2025 Pipeline Replacement - Woodstock Area

Project Information

Project Name
2025 Pipeline Replacement - Woodstock Area
Project Type
Pipeline
Project Manager
John Kahle
Project Description
The “2025 Distribution Pipeline Replacements – Woodstock Area” project consists of abandoning approximately 6,350 feet of 6” cast iron pipe installed between the 1950s and 1960s and replacing it with new 8” C-900 PVC and new fire hydrants and valves. Existing services that are galvanized steel or black poly will be replaced with copper pipe of the same diameter and all existing services will be connected to the new water main. This work will also entail water main hot-tapping, excavation, asphalt pavement, and concrete replacement.
Consultant
JVWCD
Estimated Bid Documents Available
January 2025
Estimated Construction Cost
1,800,000 to 2,400,000

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

1/27/2025 - Bid Results

Bid results for the 2025 Distribution Pipeline Replacement - Woodstock Area Project were received on January 27, 2025, at 3:00 pm. The results of the bids are posted on the district website. The district expresses its appreciation for the time and effort it takes to provide a bid for a project. Additional information is available as allowed by law.

Contract Documents and Project Information

Date Type Description Download
1/27/2025 Bid Results Bid Results Download
1/22/2025 Addendum Addendum #1 Download
1/13/2025 Planholders List Pre-Bid Meeting Sign In Sheet Download
1/6/2025 Bid Documents Bid Documents Download
1/6/2025 Drawings Drawings Download
1/6/2025 Bid Documents Technical Specifications Download