Completed Project Reports
Jordan Valley Water has completed a variety of projects over the past several years. A list of these completed projects and subsequent details can be found below.
SOPs
- Authorization of Design Contingency Funds Process to authorize use of design contingency funds.
- Contract Form Selection Which form to use for a consultant? supplier? contractor?
- Incident Reports
- Signing of Change Orders Which position should sign change orders?
- Steps to a Successful Project Plan in advance for each step to have a smooth project.
Energy Optimization
2023-2024 Completed Project Reports
- 11800 SOUTH PUMP STATION UPGRADES
- 1590 EAST WELL DEVELOPMENT
- 2022 DISTRIBUTION PIPELINE REPLACEMENTS - REDMAPLE AREA
- INSTALL PUMP #1 AT OLD BINGHAM PUMP STATION
- JA-3 CATHODIC PROTECTION SYSTEM
- JORDAN AQEUDUCT REACH 1 AND SOUTHEAST COLLECTION LINE CONDITION ASSESSMENT
- JVWCD HEADQUARTERS UPPER CAMPUS SITE & IMPROVEMENTS
- JVWTP BLOWER ROOM ACOUSTICAL IMPROVEMENTS
- JVWTP BOILERS REPLACEMENT PROJECT
- JVWTP SEDIMENTATIN BASINS 3-6 EQUIPMENT REPLACEMENT
- OLD BINGHAM HIGHWAY EQUIPMENT STORAGE BUILDING
- SERWTP BOILERS AND CONTROLS UPGRADES
- SOUTHWEST GROUNDWATER WELL IMPROVEMENTS
- ZONE "D" RESERVOIR EROSION CONTROL PLAN
2022-2023 Completed Project Reports
- 11400 SOUTH REDWOOD ROAD METER VAULT REHABILITATION
- 2022 VAULT IMPROVEMENT PROJECT
- 4700 SOUTH 5600 WEST VAULT IMPROVEMENTS
- 8518 SOUTH 960 EAST WELL PUMP REPLACEMENT
- DEEP WELL #6 WELL IMPROVEMENTS
- FIVE CONCRETE RESERVOIRS REPAIRS
- FOUR WELL REHABILITATION
- JORDAN AQUEDUCT/ALPINE AQUEDUCT BLOWOFF DRAINS
- JVWCD HEADQUARTERS UPPER CAMPUS SITE & IMPROVEMENTS
- JVWTP LANDSCAPING IMPROVEMENTS
- JVWTP PLANT RECLAIM WATER AND SOLIDS HANDLING IMPROVEMENTS
- POINT OF THE MOUNTAIN ACTUATOR REPLACEMENTS
- RESERVOIR CHLORINE BOOSTERS
- SERWTP FLUORIDE ROOM UPGRADES
2021-2022 Completed Project Reports
- 10200 SOUTH BANGERTER HIGHWAY CASING
- 10200 SOUTH ZONE B PIPELINE
- 1516 WEST 14600 SOUTH WELL IMPROVEMENTS
- 8518 SOUTH 960 EAST WELL PUMP REPLACEMENT
- BRON BRECK PIPELINE REPAIR
- DROUGHT CONTINGENCY PLAN
- FOUR WELL REHABILITATION
- HAZARD MITIGATION PLAN
- JVWTP RECLAIM WATER AND SOLIDS HANDLING IMPROVEMENTS
- SERWTP EFFLUENT FLOW METER
- SWGWTP AIR TOWER IMPROVEMENTS
- TRANSMISSION/DISTRIBUTION SYSTEM STABILIZATION STUDY
2020-2021 Completed Project Reports
- 2018 COATING AND REPAIRS
- 3600 WEST 4400 SOUTH VAULT IMPROVEMENTS
- 5200 W 6200 S TBID METER STATION VAULT IMPROVEMENTS
- 6900 SOUTH 1300 EAST VALVE VAULT UPGRADES
- 9800 S 2300 E WELL DEVELOPMENT AND PUMP TESTING
- 9800 SOUTH 2300 EAST WELL RE-LINING
- CREEK ROAD PIPELINE VAULT UPGRADES
- EQUIPMENT STORAGE BUILDING
- HEADQUARTERS AND JVWTP HVAC INTEGRATION
- JNPS AUTOMATION UPGRADE
- JVWTP CHLORINE ROOM CRANE IMPROVEMENTS
- JVWTP FLOCCULATION BASINS REPAIRS
- MICROWAVE RADIO SYSTEM UPGRADE
- MIDVALE RETAIL TRANSFER
- MILLCREEK AND SOUTH SALT LAKE PIPELINE REPLACEMENTS
- SWGWTP AIR TOWER IMPROVEMENTS
- SWGWTP FINISHED WATER TO WASTE VALVE UPGRADE
- TERMINAL RESERVOIR BASIN 2 OUTLET VALVE REPLACEMENT
- TERMINAL RESERVOIR BASINS I AND II JOINTS REPAIRS
- TRANSMISSION/DISTRIBUTION STABILIZATION STUDY
2019-2020 Completed Project Reports
- 3200 WEST 6200 SOUTH VAULT UPGRADES
- 6000 WEST 4700 SOUTH VAULT MODIFICATIONS
- 7271 WEST 11800 SOUTH PIPELINE EXTENSION
- DEEP WELL #7 PROPERTY SUBDIVISION
- JA-2 SLEEVE VALVES REPAIR
- JVWTP AIR SCOUR SYSTEM UPGRADES
- LANDSCAPE IMPROVEMENT - 108 EAST 11400 SOUTH
- LOWER CAMPUS PAVING
- MURRAY AND SOUTH SALT LAKE PIPELINE REPLACEMENTS
- SCADA SYSTEM REPLACEMENT
- SECURITY CAMERA UPGRADE 2019
- SERWTP FILTER BUILDING IMPROVEMENTS
- SOUTHWEST AQUEDUCT REACH 1
2018-2019 Completed Project Reports
- 11800 S ZONE C PUMP STATION
- 11800 SOUTH U-111 PIPELINE PROJECT
- 1453 EAST 9400 SOUTH WELL AND 8518 SOUTH 960 EAST WELL PUMP REPLACEMENTS
- 2018 DISTRIBUTION PIPELINE REPLACEMENT
- BCWTP MANGANESE FILTERS
- DEEP WELL #6 AND DEEP WELL #7 PUMP REPLACEMENT
- FLOW CONTROL AND METER STATION AT 7800 SOUTH 1000 EAST
- JA-4 SLEEVE VALVES REPAIR
- JVWTP 12.5 MG RESERVOIR
- JVWTP FILTER WASHWATER PRE-DESIGN UPGRADE
- JVWTP WELBY CANAL BOX STRUCTURE
- NANILOA RESERVOIR IMPROVEMENTS
- PIPELINE CONDITION ASSESSMENT
- RETAIL METER REPLACEMENT AND ADVANCED METERING INFRASTRUCTURE UPGRADES
2017-2018 Completed Project Reports
- 11400 SOUTH PIPELINE CATHODIC PROTECTION UPGRADES
- 2017 DISTRIBUTION PIPELINE REPLACEMENT
- 2400 CREEK ROAD PRV STATION AND 1300 EAST PRV STATION IMPROVEMENTS
- CAROL, COLLEGE, AND WILLOW CREEK PUMP REPLACEMENT
- JA-4 STATION 308 GATE VALVE REPAIR
- JORDAN NARROWS IMPROVEMENTS II PROJECT
- VEHICLE MAINTENANCE BUILDING HVAC UPGRADES
- WELL PUMP STATION CHEMICAL FEED IMPROVEMENTS
- WEST TEMPLE /MAIN ST. PIPE REPLACEMENT
2016-2017 Completed Project Reports
- Conservation Garden Four Exhibits
- JVWTP Fire Alarm Project
- JVWTP Lab HVAC Upgrades
- SERWTP Filter Bldg. Improvements-Roof Replacement
- Southeast Regional Water Treatment Plant Meter Vault and Clearwell Upgrades
- Supply and Installation of Skid-Mounted Chlorination Systems
- SWGWTP Cartridge Filter Upgrades
2015-2016 Completed Project Reports
- 10200 SOUTH CAPACITY IMPROVEMENTS PROJECT
- 2015 MURRAY DISTRIBUTION REPLACEMENTS - CHEVY CHASE AREA
- 4500 SOUTH WATERLINE IMPROVEMENTS
- BINGHAM CREEK CATHODIC PROTECTION SYSTEM
- BYPRODUCT PIPELINE PHASE IV
- CENTRAL PIPELINE PROJECT
- JORDAN & ALPINE AQUEDUCTS CATHODIC PROTECTION PROJECT
- SWGWTP OVERFLOW UPGRADES
- TATEOKA WELL ABANDONMENT
- TERMINAL RESERVOIR BASINS 1 AND 2 DECK REPAIRS PROJECT
- WELL REDEVELOPMENT AND TESTING AT 2776 EAST ETIENNE WAY AND 7038 SOUTH COTTONWOOD STREET