Jordan Valley Water Treatment Plant Backwash Outlet Valve Replacements
Project Information
Project Name
Jordan Valley Water Treatment Plant Backwash Outlet Valve Replacements
Project Type
Valve & Meter Vaults
Project Manager
John Kahle
Project Description
This work includes replacing two 36” butterfly valves with new electronically actuated valves located on the outlet structure of the backwash reclamation ponds at the Jordan Valley Water Treatment Plant (JVWTP). The work also includes running two conduits to provide power to the actuators and new outlet receptacles.
Estimated Bid Documents Available
February 2025
Construction Contract Date
4/9/2025
Bids Due
3/20/2025 3:00 PM
Contact/Planholders List
This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.
Public Notices
3/19/2025 - Bid Documents Addendum
Addendum No. 2 is now available on the JVWCD website. Please acknowledge this addendum on sheet C-1 of the Bid sheet. The bid due date has been extended, as listed within the addendum.
Contract Documents and Project Information
Date | Type | Description | Download |
---|---|---|---|
3/19/2025 | Bid Documents Addendum | Addendum #2 | Download |
2/26/2025 | Bid Documents | Bid Documents | Download |
2/26/2025 | Drawings | Drawings | Download |
2/26/2025 | Attachment | Technical Specifications | Download |