Jordan Valley Water Treatment Plant Backwash Outlet Valve Replacements

Engineering project details, documents, and contact information can be found below.

Jordan Valley Water Treatment Plant Backwash Outlet Valve Replacements

Project Information

Project Name
Jordan Valley Water Treatment Plant Backwash Outlet Valve Replacements
Project Type
Valve & Meter Vaults
Project Manager
John Kahle
Project Description
This work includes replacing two 36” butterfly valves with new electronically actuated valves located on the outlet structure of the backwash reclamation ponds at the Jordan Valley Water Treatment Plant (JVWTP). The work also includes running two conduits to provide power to the actuators and new outlet receptacles.
Estimated Bid Documents Available
February 2025
Construction Contract Date
4/9/2025
Bids Due
3/20/2025 3:00 PM

Contact/Planholders List

This list includes engineers, contractors, subcontractors, suppliers, and others associated with this project. You MUST sign up to receive addenda and revisions, project notifications and other project information.

Download List

Public Notices

3/19/2025 - Bid Documents Addendum

Addendum No. 2 is now available on the JVWCD website. Please acknowledge this addendum on sheet C-1 of the Bid sheet. The bid due date has been extended, as listed within the addendum.

Contract Documents and Project Information

Date Type Description Download
3/19/2025 Bid Documents Addendum Addendum #2 Download
2/26/2025 Bid Documents Bid Documents Download
2/26/2025 Drawings Drawings Download
2/26/2025 Attachment Technical Specifications Download